Tiengen (Freiburg) Fire Department
About the Property
Rosenfelder
Akotherm specialist
Waldshut-Tiengen Freiburg, Germany
Property Address
2005
Year of Construction
Kino Forum, Offenburg
About the Property
Klass Metall GmbH
Akotherm specialist
Lehmann-Architekten
Architects
Offenburg, Germany
Property Address
2008
Year of Construction
VR Bank Building, Neuwied
About the Property
Infer Metall-Elemente GmbH
Akotherm specialist
Berghaus + Michalowicz GmbH
Architects
Neuwied, Germany
Property Address
2007
Year of Construction
Akkom Office Park, Istanbul - Turkey
About the Property
Erbay Aluminium
Akotherm specialist
Tago Architects
Architects
Istanbul, Turkey
Property Address
2009
Year of Construction
Ärztehaus, Lahr - Black Forest
About the Property
Klass Metall GmbH
Akotherm specialist
Werkgruppe Lahr
Architects
Lahr, Germany
Property Address
2009
Year of Construction
Berry Street residential building, Brooklyn, NY - USA
About the Property
ERA-USA, Contracting LLC
Akotherm specialist
Karl Fischer Architect
Architects
154 Berry Street, NY Brooklyn, USA
Property Address
2012
Year of Construction
Office building with round facade AT 500 F - Sindorf Kreisel
About the Property
Kruff Metallbau GmbH
Akotherm specialist
Wilberg und Partner, Cologne
Architects
Kerpen-Sindorf (Sindorf Kreisel)
Property Address
2001
Year of Construction
Tripoli International Convention Center
Thanks to the flexible production technique of the AT 500 CS, combined with various mullion and transom profiles and integrating doors and windows, various opening styles could be used in the facade without losing the elegant all-glass look. Another requirement was the local thermal circumstances: At an average temperature of over 20 degrees from April to November it was important to achieve the best possible insulation. This was met by the ultra modern insulation concept of the AT 500 CS. The insulation is supported by a semi-transparent curtain mesh which keeps out the sun. Here the architects chose enough distance between mesh and glass facade to also create a colonnade which also adds to the building’s overall cooling load.
In addition, the large roof projection which continues to the ground at the corners of the building due to the curtain structures. This gives the impression of a circumferential outer shell. 8,500 sq m of stainless steel mesh – based on the colors of the desert sand – were painted in a bronze shade and stretched across 500 diamond and trapeze shaped panels. Since the panels vary in size, the irregular pattern this creates is reminiscent of tree bark and gives the building a mystic character.
About the Property
ARTE Yapi Sistemleri San. Ve Tic. Ltd. Sti.
Akotherm specialist
Tabanlioglu Architects
Architects
Sirte, Libya
Property Address
2013
Year of Construction
Schnorpfeil Office Building
About the Property
Metallbau Berenz
Akotherm specialist
SIAP Schmitt Ingenieure + Architekten
Architects
Treis Karden, Germany
Property Address
2017
Year of Construction